Print

Time Engineering

Adjust continually and stay on schedule.

graphique_time_eng_fr

Time Engineering is a systematic project management method used to adapt to changing conditions on construction projects—particularly fast-track projects.

Time Engineering comes from Canatal’s corporate commitment to delivering projects on time without ever compromising on quality.

At Canatal, we save time by adapting to change: the design is better, fabrication sequences are revisited, logistics are updated, and we find new ways to speed on-site installation. That’s Canatal promise to you!

Time Engineering means:

  • Identifying a specific TE goal

  • Having a positive strategic impact on construction project schedules

  • Showing TE leadership

  • Constantly evaluating Time Engineering outcomes by measuring and comparing results