Print

Time Engineering Scheduling Model

A dynamic system. Smart changes.

The TE Scheduling Model is our tool of choice for dealing with fast-track projects. Configured for dynamic change management, it processes project changes as soon as they’re entered. It’s the link between our powerful information technology and the ingenuity of the whole team.

In the construction industry, mid-project changes can be costly. That’s why we’re proud to have the expertise and technology to take changes in stride and keep projects on schedule.

scheduling_model

Canatal’s Time Engineering Scheduling Model

  • Is a powerful tool for keeping production units on schedule
  • Dynamically integrates requests added to the production schedule midproject
  • Supplies the information needed to reassign resources
  • Makes for a more agile manufacturing process
  • Manages and balances out work schedules